The following XPS predicted run dates are tentative, and can be delayed based on the instrument and samples ahead of you, when delays occur in most cases the line order will remain the same and all following runs will be delayed by the same amount.

Kratos Axis Supra+

Current Status: Operational

In line;

K. Sardashti (1/10)

W. Qu (1/13)

H. Ghebremichael (1/14)

A. Uy (1/15-1/16)

T. Lee (1/17)

Pending;

UIUC

N. Zhang

Y. Miao

Kratos Axis 165

Current Status: Maintenance

In line;

Pending;